Badanie wydajności zestawu ruchów rolkowych kontenerów ciężkich (4)

Inne filmy
August 23, 2024
Połączenie kategorii: Sprzęt Evercross
Krótko: Discover the Heavy-Duty Container Roller Movement Set in action! This 25-ton capacity equipment is designed for efficient short-distance movement of standard shelters and shipping containers. Watch its performance test and learn how it enhances logistics operations with hydraulic lifting and mobility.
Powiązane cechy produktu:
  • Designed for moving standard shelters and shipping containers with ease.
  • Hydraulic system locks reversely to prevent containers from falling.
  • Suitable for both 40ft and 20ft standard containers.
  • Includes moving wheels, lifting rods, and a hydraulic system for robust performance.
  • Enhances safety and efficiency in container handling operations.
  • Operated by 4 persons for installation and roll-up.
  • Ideal for military, disaster response, and industrial applications.
  • Comes with a detailed maintenance guide for long-term use.
Pytania:
  • What is the maximum weight capacity of the Moving Kitchen Hut Moving Lifting Container Equipment?
    The equipment has a maximum weight capacity of 25 tons, making it suitable for heavy-duty container movements.
  • How many people are required to operate the Container Movement Set?
    Four persons are needed for the installation and roll-up of the Container Movement Set to ensure safe and efficient operation.
  • What types of containers is this equipment compatible with?
    The Container Movement Set is compatible with both 40ft and 20ft standard containers, providing versatile handling solutions.
  • What safety features does the hydraulic system include?
    The hydraulic system can be locked reversely to prevent shelters or transportation containers from falling, ensuring safe and controlled lifting and movement.
Powiązane wideo

Fabryka Evercross

Fabryka Evercross
August 26, 2024

Ściernica ścierna

Narzędzia ścierne
November 12, 2024

Fabryka Evercross

Fabryka Evercross
August 26, 2024

Fabryka Evercross 2

Fabryka Evercross
August 26, 2024

Mostek modułowy 3

Stalowy most Baileya
August 23, 2024

Modułowy mostek 2

Stalowy most Baileya
August 23, 2024

Molo mostu Bailey

Most Baileya
August 20, 2024

Realizacja projektu w Mozambiku

Fabryka Evercross
January 07, 2026